Construction Compliance
Certified payroll in the WH-347 layout, prevailing-wage rates per project, a lien waiver check before each contractor payment, the surety controls template and a free COI checker.
Contractors on public work must prove they paid prevailing wages, collected lien waivers and kept their subcontractors insured. Muin builds that proof from your payroll, bills and vendor records.
Prevailing-wage rates
On Payroll (/hr/payroll), the Prevailing-wage rates card holds the wage determination rates for each project. Add a rate with:
- Project reference and Wage determination (for example CA20260001)
- Classification
- Base rate per hour and Fringe per hour
- Effective from and, optionally, Effective to
Add the rates for a project before you generate its certified payroll. Changing or deleting a rate does not change reports already generated; they keep the rate they used.
Certified payroll (WH-347)
From a payroll run, open Certified payroll and choose Generate draft. Muin builds one report per project and week, following the layout of U.S. DOL form WH-347, from approved time entries charged to the project and the run’s pay stubs.
A report cannot be final while something is wrong. Each problem names its fix:
| Problem | Fix |
|---|---|
| Missing rate | Add a prevailing-wage rate for this classification on the project. |
| Missing identifier | Add an employee number on the worker’s HR record. |
| Underpaid | Pay the difference before the report can be final. |
| No hours | Approve the time entries charged to the project for this week. |
| No pay stub | The worker has no pay stub in this payroll run. |
Finalize and sign records the statement of compliance with your name and title. Mark submitted records that the report was sent to the contracting agency. A submitted report cannot be changed or regenerated.
Lien waivers per pay application
On a contractor’s bill (/payments/vendor-bills/:billId), the Lien waivers panel tracks waivers for that pay application:
- Request waiver: type (conditional or unconditional, progress or final), amount, work-through date and an optional pay application number.
- Mark received: upload the signed waiver; it is stored with the bill’s documents.
- Reject: give the reason the contractor needs to fix, then request again.
The panel shows how much of the bill the received waivers cover. In Vendors > Compliance (/vendor/compliance), the Lien waiver check before paying a contractor setting decides what happens when a waiver for the full amount is missing:
- Warn: pay and show the gap.
- Block: hold the payment until a lien waiver for the full amount is on file.
The check applies with Subcontractor Management, to bills from contractor vendors. A vendor that is not a contractor needs no waiver. Contractors are managed in the vendor directory (/vendor/directory).
Surety controls template and surety pack
Import the Construction Surety Controls template from Compliance > Frameworks to test the controls a surety asks about, starting with pay applications and lien waivers.
The Surety pack card on Payroll summarizes what a surety underwriter asks for: certified payroll reports final or submitted, drafts not signed, projects and latest week reported, contractor bills paid without a full lien waiver, contractors with expired insurance, and control test results from the surety template.
Free COI checker
The public COI checker at /tools/coi-checker reads a certificate of insurance PDF (up to 10 MB) and shows the insurer, policy types, expiry dates and days left. It needs no account and stores nothing. To track every vendor’s insurance, sign up and use Vendors.